Cabela's
How Woulf Group helped Cabela's achieve 40% higher throughput in their 200K sq ft distribution center.
40%
Throughput Increase
6 weeks
Implementation Time
$2.1M
Project Value
99.2%
Pick Accuracy
Cabela\'s needed to expand their distribution capabilities to handle growing e-commerce demand. Their 200,000 square foot facility required a complete systems integration — new racking systems, conveyor networks, and warehouse management software — all while maintaining ongoing operations.
Woulf Group designed and executed a phased implementation plan that kept the facility operational throughout. We installed high-density selective racking, a 2,400-foot conveyor system with automated sortation, and integrated everything with their existing WMS. Our team managed the project from design through commissioning.
“Woulf Group delivered on time and on budget. The phased approach meant we never had to shut down operations.”